Gorgon Stage 2

TCO Future Growth Project
February 28, 2020
Block KG-DWN-98/3 (KG-D6)
February 28, 2020

Gorgon Stage 2

Project Name GORGON STAGE 2
Project Owner CHEVRON AUSTRALIA PTY LTD
Year of Completion 2020 (on-going)
62.3 km of 24" OD, 18" OD, 8"OD and 6" OD pipes
Scope of Work Supply of Fusion Bonded Epoxy Coating + Rough Coat Coatings to the external surface of Carbon Steel (CS) and Corrosion Resistant Alloy (CRA) line pipe, Bracelet Anodes, Preservation and Pipe Storage.
Project Location North-West Coast of Western Australia

Gorgon Stage Two (GS2) development project is a proposed expansion of the Gorgon liquified natural gas (LNG) project, located approximately 130km off the north-west coast of Western Australia, at a water depth of around 200m to 1,300m. The Gorgon natural gas facility expansion aims to modernise the project's current subsea facilities to ensure sufficient production for future gas supply.

Three additional infill wells will be drilled and tied back the existing Gorgon M1 Manifold, while four wells will be tied back to a new Gorgon M4 Manifold, and four to a new Jansz Drill Centre 3 (DC-3) combined Manifold/PTS.

New infield control umbilicals will be installed at Gorgon M4 and Jansz DC-3 in addition to the installation of interconnecting flying leads to allow control of the facility.