Project Name Prai II Lateral Gas Pipeline Project
Project Owner Petronas Gas Berhad (PGB)
Client Petronas Gas Berhad (PGB)
Year of Completion 2015
Scope of Work 22 km of 28” pipeline projects
Project Location Lunas to TNB Area, Pulau Penang - Malaysia
This pipeline crossed distinct areas, each with its own challenges. Construction and installation of the pipeline through plantation areas proved to be quite straightforward, but it was an entirely different story when it came to installing the pipeline through paddy fields, alongside existing live pipelines, unstable soils prone to soil erosion and through a congested industrial zone with high voltage electricity cables to navigate and strict shut-down protocols whilst adhering to rigid safety procedures.