Client | Wasco Engineering Services Singapore |
---|---|
Project Owner | Chevron Thailand |
Start Date | 25th May 2013 |
Completion | Load out on 11 Dec 2013 (23 sets PV in phases) |
Location | Fabrication : WEI – Batam Indonesia Delivered To: Singapore |
PT. WASCO Engineering (WEI) awarded Contract from Wasco Engineering Services Singapore (WESS) for 3 batch packages presure vessel as per Kick off Meeting dated 16th of May 2013 in Singapore.
PV fabricate both 68 units package skin tag no G6408 GID15/16/17/18 X G409 BCE 18/19/20/21. Packages qt includes 8 units inlet Separator, 20 units Scrubber and 40 units Bottles. Fabrication packages refer client supplied IFC Drawings , materials receiving, Specification and approved ITP, Procedures.
Scope of work includes :