Gorgon Upstream Project
January 1, 2012APLNG Upstream Phase 1 Project
January 1, 2013
Kebabangan Northern Hub Project
Project Name |
Kebabangan Northern Hub Project |
Project Owner |
Kebabangan Petroleum Operating Company (KPOC) |
Year of Completion |
2012 |
Scope of Work |
253km of 8"-24" OD pipes. FBE, AE and CWC Coating |
Project Location |
Malaysia (Coating done in Kuantan Plant) |
The Kebabangan gas field is located in the South China Sea, 130km offshore Sabah, East Malaysia. It is part of the Kebabangan Cluster, which contains two more fields Kamunsu East and Kamunsu East Upthrown Canyon. The water depth at the cluster ranges from 100m to 400m. The cluster is owned by Petronas Carigali (40%), ConocoPhillips (30%) and Shell (30%). The three co-owners signed the development and production sharing contract for the cluster in 2007. A joint-venture called Kebabangan Petroleum Operating Company (KPOC) was set up to act as the cluster operator. A project named The Kebabangan Northern Hub Project was undertaken to develop the three fields in the cluster.